Use Building Information Modelling (BIM) beyond Design
BIM Project Management
BIM project management is the use of Building Information Modeling (BIM) technology to manage construction projects. BIM is a digital process that creates a virtual model of a building before construction begins. This model allows project participants to collaborate and work together on the project, which can improve efficiency, reduce errors, and enhance communication
Federated BIM
Federate Multi- Disciplinary BIM Models
Federating multi-disciplinary BIM (Building Information Modeling) models involves integrating various models from different disciplines—such as architecture, structural engineering, MEP (mechanical, electrical, and plumbing), and construction—into a single, cohesive environment. By federating these models, project stakeholders can maintain consistency across disciplines, improve coordination, and streamline decision-making during the design and construction phases of a project

BIM Guidelines
Ensure BIM Models follows the defined guildelines
Ensuring BIM models follow defined guidelines involves setting up a robust BIM execution plan (BEP) and adhering to industry standards like ISO 19650 or local BIM protocols. The process includes implementing model validation and auditing tools to check for compliance with these standards. Regular quality checks and reviews by BIM coordinators ensure that all disciplines are aligned with the project requirements, minimizing errors and maintaining adherence to the defined guidelines throughout the project lifecycle.

BIM & Non - BIM Quantities
Quantity take-off from the BIM Models for both BIM based and Non BIM based elements
Quantity take-off (QTO) from BIM models involves extracting material and component quantities from both BIM-based and non-BIM-based elements. By leveraging both BIM-based and non-BIM-based methods, you ensure complete and accurate quantity take-offs for all project elements, facilitating better cost estimation, material procurement, and project planning.

BIM- Project Schedule Integration
Integrate Project Schedules with BIM Models (MS Project/ Primavera)
Integrating project schedules from MS Project or Primavera with BIM models, known as 4D BIM, links time-based data with the 3D model. This integration enables better visualization of construction progress, enhanced planning, and real-time tracking. It allows project teams to assess planned versus actual timelines, foresee potential delays, and improve coordination.

BIM based Progress Updates
Use BIM Models to report progress in real time instead of schedules
Using BIM models to report progress in real time enhances project management by providing a dynamic and visual representation of work completed. By visually marking progress within the model (e.g., using color codes to indicate completion status), stakeholders can quickly assess project health. Interactive dashboards can summarize key metrics, promoting transparency and facilitating collaboration

BIM based Contract Management
Monitor work packages and monthly payment certificates
Monitoring work packages and monthly payment certificates using BIM enhances project efficiency and financial accuracy.Each work package is linked to specific components in the BIM model, allowing for real-time tracking of progress. As tasks are completed, updates can be directly reflected in the model, providing a visual representation of work done.

BIM Document Management
Link Project Documents to BIM Models for Operations & Maintenance
Linking project documents to BIM models for operations and maintenance (O&M) enhances asset management and facilitates efficient facility operations. By integrating essential documents—such as maintenance manuals, warranties, and safety procedures—directly into the BIM model, stakeholders can easily access relevant information associated with each component of the building.

BIM Analytics Dashboards
BIM Integrated Project Management Dashboards
BIM-integrated project management dashboards provide a centralized platform for visualizing, analyzing, and managing project data in real time. These dashboards combine various data sources, including BIM models, schedules, budgets, and progress reports, into a cohesive interface that enhances decision-making and project oversight. BIM-integrated project management dashboards serve as powerful tools that enhance project visibility, streamline workflows, and improve collaboration, ultimately leading to more successful project outcomes.

BIM Clash Detection
Ensure BIM Models follows the defined guildelines
Our system offers automated clash identification, real-time collaboration, and customizable clash rules, enabling seamless issue detection. It also provides clear visualization of clashes and prioritization to streamline resolution efforts.

4D/ 5D BIM Simulations
Simulate project plan and progress with time and cost
4D/5D BIM simulations integrate time (4D) and cost (5D) data into Building Information Modeling, enabling better project planning, scheduling, and budgeting. These simulations help visualize construction sequences, optimize resources, and improve decision-making, ultimately enhancing project efficiency and reducing risks.